Rural road network project in Shidian County
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The project content of this project is mainly road engineering (basic level road). The project involves 5 towns in Shidian County (Dianyang Town, Taiping Town, Yuwang Town, Renhe Town, Yaoguan Town) and 8 Townships (Shuichang Township, Laomai Township, Heyuan Township, Wanxing Township, Wine Room). Townships, old towns and villages, Mu Laoyuan Blang and Yi nationality, and the Yi people's Blang et
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project content of this project is mainly road engineering (basic level road). The project involves 5 towns in Shidian County (Dianyang Town, Taiping Town, Yuwang Town, Renhe Town, Yaoguan Town) and 8 Townships (Shuichang Township, Laomai Township, Heyuan Township, Wanxing Township, Wine Room). Townships, old towns and villages, Mu Laoyuan Blang and Yi nationality, and the Yi people's Blang ethnic group), due to the poor quality of the old roads, are basically new projects. The project covers an area of ??5,540 mu and the old road uses 5,540 mu. The proposed rural road route is 540.216km in length, of which the basic road (6.5m road width) is 204.222km, the basic road (4.5m road base width) is 335.994km. SPV is Shidian County Tongtu Highway Development Co., Ltd., a JV between the sponsors Yunnan Construction Infrastructure Investment Co., Ltd. (79.2%), Yunnan Water Resources and Hydropower Engineering Co., Ltd. (0.08%) and the state-owned Shidian County Hongrun Highway Construction Investment Co., Ltd. (20%). Type of concession is BOT with a contract period of 18 years. Financial close took place on April 12, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=a875c794700140fb903b86e28277a36b |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
