Rural Water Supply and Sanitation Project
Sector: Water Supply and Storage • Location: Tajikistan
Source: World Bank
The development objectives of Rural Water Supply and Sanitation Project for Tajikistan are to (i) improve access to basic water supply and sanitation services in selected districts; and (ii) strengthen the capacity of institutions in the water supply and sanitation sector. This project has three components. 1) The first component, Water Supply and Sanitation Infrastructure Investments, has the fol
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Education, Commercial
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Rural Water Supply and Sanitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objectives of Rural Water Supply and Sanitation Project for Tajikistan are to (i) improve access to basic water supply and sanitation services in selected districts; and (ii) strengthen the capacity of institutions in the water supply and sanitation sector. This project has three components. 1) The first component, Water Supply and Sanitation Infrastructure Investments, has the following subcomponents: (i) Investments in Water Infrastructure; and (ii) Investments in WASH conditions of social institutions. 2) The second component, Institutional Strengthening and Capacity-Building of Water Sector Institutions, aims to finance goods, services, and training to support a range of institutional strengthening and capacity-building activities (also related to social mobilization and WASH behavior change interventions) to be implemented at the local and national levels. It has the following subcomponents: (i) National-level Agencies; and (ii) District or Local-level agencies. 3) The third component, Project Management and Implementation Support, aims to finance the costs of (a) coordinating and implementing the project; (b) preparation of pre-investment studies and designs; (c) project monitoring and evaluation (M and E) activities and implementation of baseline and end line surveys; (d) preparation of annual project audits; and (e) project grievance redress mechanism (GRM) allowing for a water utilities customer complaints registration system. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Tajikistan |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Education, Commercial |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tajikistan
- Sangtuda 2 Hydropower Plant
- PamirEnergy
- Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches
- Enhancing Sustainability: Financing for the Rogun Hydropower Project
- Yavan Water
- Tajikistan: Nurek Hydropower Rehabilitation, Phase I
- Water Resources Management in Pyanj River Basin Project
- Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
