RURAL WATER SUPPLY I
Sector: Water Supply and Storage • Location: Kenya
Source: World Bank Group
The project would provide convenient, safe and reliable water to a rural population of about half a million, and would also strengthen the Ministry of Water Development's (MWD) organization and management capability to plan expansion programs and to operate and maintain water supply schemes. The project would consist of: (i) construction of 33 rural water supply schemes; (ii) strengthening of MWD'
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project would provide convenient, safe and reliable water to a rural population of about half a million, and would also strengthen the Ministry of Water Development's (MWD) organization and management capability to plan expansion programs and to operate and maintain water supply schemes. The project would consist of: (i) construction of 33 rural water supply schemes; (ii) strengthening of MWD's operation and maintenance and direct labor sections; and (iii) technical assistance for implementation of the recommendations of the management study aimed at strengthening MWD. The schemes would supply between 100 and 10,000 households each, through a mixture of individual connections, communal water points and kiosks. The project would face risks.ks related to the capacity of MWD to plan, construct, operate and maintain rural water schemes satisfactorily; the implementation of effective collection methods could also present problems. However, measures to strengthen MWD have already begun, and the inclusion in the proposed project of steps to accelerate training, improve financial control mechanisms, and provide for implementation of the program of management consultancy services, combined with the recruitment of additional trained staff should substantially reduce these risks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
