RURAL WATER SUPPLY I
One of 7,540 projects Taiyo tracks in Kenya.
Source: World Bank Group
The project would provide convenient, safe and reliable water to a rural population of about half a million, and would also strengthen the Ministry of Water Development's (MWD) organization and management capability to plan expansion programs and to operate and maintain water supply schemes. The project would consist of: (i) construction of 33 rural water supply schemes; (ii) strengthening of MWD'
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RURAL WATER SUPPLY I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would provide convenient, safe and reliable water to a rural population of about half a million, and would also strengthen the Ministry of Water Development's (MWD) organization and management capability to plan expansion programs and to operate and maintain water supply schemes. The project would consist of: (i) construction of 33 rural water supply schemes; (ii) strengthening of MWD's operation and maintenance and direct labor sections; and (iii) technical assistance for implementation of the recommendations of the management study aimed at strengthening MWD. The schemes would supply between 100 and 10,000 households each, through a mixture of individual connections, communal water points and kiosks. The project would face risks.ks related to the capacity of MWD to plan, construct, operate and maintain rural water schemes satisfactorily; the implementation of effective collection methods could also present problems. However, measures to strengthen MWD have already begun, and the inclusion in the proposed project of steps to accelerate training, improve financial control mechanisms, and provide for implementation of the program of management consultancy services, combined with the recruitment of additional trained staff should substantially reduce these risks. |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kenya
- Acquisition of equipment and Facilities for expansion of hospitality project
- LAKE CHALLA INTEGRATED WATER RESOURCE DEVELOPMENT PROJECT
- DEVELOPMENT OF LOWER TURKWEL IRRIGATION PROJECT UNDER SUGARCANE PRODUCTION
- M-SAFI WASTE EXPERTS
- Ewaso Ng'iro Tannery and Leather Factory
- Oserian Two Lakes Industrial Park
- Bamboo Commercialization
- Tea Factory
