logo

Rutgers University Chemistry and Chemical Biology Building, New Jersey

Sector: Cable car • Location: World

Source: Pharmaceutical Technology

Project
Closed

Construction of a new Chemistry and Chemical Biology (CCB) building began in June 2014 at the Rutgers University's Busch campus in New Jersey, US. Chemistry and chemical biology building Rutgers University’s Busch campus, New Jersey June 2014 Fall 2016 $115m Flad Architects Worth Construction, Lend Lease Construction, Langan Engineering, R.G. Vanderweil Engineers, and Concord Engineering Construct

Project Information FAQ

Project Information

5 Q
The project “Rutgers University Chemistry and Chemical Biology Building, New Jersey” is an infrastructure initiative in the Cable car sector, located in World. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction of a new Chemistry and Chemical Biology (CCB) building began in June 2014 at the Rutgers University's Busch campus in New Jersey, US. Chemistry and chemical biology building Rutgers University’s Busch campus, New Jersey June 2014 Fall 2016 $115m Flad Architects Worth Construction, Lend Lease Construction, Langan Engineering, R.G. Vanderweil Engineers, and Concord Engineering Construction of a new Chemistry and Chemical Biology (CCB) building began in June 2014 at the Rutgers University’s Busch campus in New Jersey, US. The new facility, expected to be opened for operations in Fall 2016, will expand research and science education at the university. The CCB building construction is expected to be completed with an investment of $115m. The majority of the funding came through an $82m grant under the Building Our Future Bond Act 2012, which was passed by New Jersey State Legislature. The remaining $33m will be contributed by Rutgers University. Located on the south campus of the University at Buffalo in New York, US, it houses the School of Pharmacy and Pharmaceutical Sciences of the university. The CCB facility will be a four-storey building with a total floor space of 145,000ft². It is being constructed adjacent to the Wright-Rieman Chemistry complex. The first floor of the building will comprise of seminar, office and instructional space. The second, third and fourth floors will accommodate laboratories and related office spaces. Infrastructure and equipment will be located in the building’s penthouse and basement levels. The facility will have modern laboratory and specialty research core facilities that can enhance innovative research in drug design, alternative energy, biomaterials and nanotechnology. It will augment collaborative research as it features flexible labs, modern instructional space and a layout that facilitates the informal interaction and collaboration needs of a scientific community. It will also have dedicated space for smart classrooms for high quality science education. The classrooms will be facilitated with sophisticated technology to support teaching and learning. The CCB facility will be equipped with latest technology to enhance the research and provide the catalyst for extraordinary discovery. It will be equipped with transmission electron microscopy (TEM), scanning electron microscopy (SEM), atomic force microscopy (AFM) and helium ion microscopy (HIM). It will include Class 100 chemistry clean rooms, as well as optical spectroscopy. It will also feature a nuclear magnetic resonance spectroscopy and X-ray crystallography laboratories. The CCB building broke ground for construction in June 2014 and is slated to be completed before the end of 2016. The building was designed by Flad Architects. The general construction contract was awarded to Worth Construction. Lend Lease Construction was contracted to provide project management and construction services, Langan Engineering was contracted to provide civil engineering services, and RG Vanderweil Engineers was awarded mechanical engineering services contract. Concord Engineering, as commissioning agent, will provide Owner documented verification for the CCB building. The new CCB building will be constructed to obtain Leadership in Energy and Environmental Design (LEED) Gold certification. The building will feature eco-friendly green designs such as windows to maximise natural light and manage heat gain, as well as advanced air handling and exhaust systems. Construction materials such as steel, concrete and others used for the building will be largely made with recycled content. Native vegetation will be encouraged for biodiversity and to reduce the need for irrigation. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data