logo
ProjectProject Awarded

Ruzhou Veinous Industrial Park Solid Waste Integrated Treatment PPP Project

Project awarded · China

Source: InfraPPPWorld

The scheme of the project will be invested in and constructed on a PPP model for a concession period of 30 years. The Ruzhou Industrial Park Project consists of multiple solid waste treatment systems, covering household waste-to-energy, sludge treatment, food waste treatment, with a daily processing capacity of 1,300 tonnes in total for various types of solid waste.The Project will be deployed in

Status
Closed
Sector
Power Generation (CCGT), Biomass, Waste Processing and Treatment, Manufacturing (Industrial), Wind, Water Supply and Storage
Location
China
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Ruzhou Veinous Industrial Park Solid Waste Integrated Treatment PPP Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ruzhou Veinous Industrial Park Solid Waste Integrated Treatment PPP Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Not available for this record.

Status

Original status

project awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scheme of the project will be invested in and constructed on a PPP model for a concession period of 30 years. The Ruzhou Industrial Park Project consists of multiple solid waste treatment systems, covering household waste-to-energy, sludge treatment, food waste treatment, with a daily processing capacity of 1,300 tonnes in total for various types of solid waste.The Project will be deployed in two phases. The first one will have a daily solid waste processing capacity of 800 tonnes and will be equipped with a a 12 MW turbine power generator and a self-developed 700 tonnes/day mechanic grate furnace. The facility is expected to generate about 96,000,000 kWh of green energy per annum.

Original sector

Water & Waste

Procurement method

Location

Country

China

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Biomass, Waste Processing and Treatment, Manufacturing (Industrial), Wind, Water Supply and Storage

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project