Ruzizi III Hydropower Project
Sector: Hydro • Location: Burundi, Democratic Republic of the Congo, Rwanda
Source: International Water Power
The Ruzizi III project is a planned 206 MW run-of-river hydropower plant on the Ruzizi River, designed to supply electricity to Burundi, the Democratic Republic of the Congo, and Rwanda. It is expected to reach financial close in 2026 and will significantly increase installed capacity in the three countries.
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Water Supply and Storage
- Location
- Burundi, Democratic Republic of the Congo, Rwanda
- Updated
- 22 Jul 2026
- Source
- International Water Power
ConstructChat
Ask ConstructChat about Ruzizi III Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ruzizi III project is a planned 206 MW run-of-river hydropower plant on the Ruzizi River, designed to supply electricity to Burundi, the Democratic Republic of the Congo, and Rwanda. It is expected to reach financial close in 2026 and will significantly increase installed capacity in the three countries. |
Original sector | Energy |
Location
Country | Burundi, Democratic Republic of the Congo, Rwanda |
Source
Source | International Water Power |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Water Supply and Storage |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
