Rwanda - Bank of Kigali
Sector: Manufacturing (Industrial) • Location: Rwanda
Source: African Development Bank (AfDB)
The proposed transaction is a US $ 12 million line of credit (LOC), split into USD 8 million as sub debt and USD 4 million as senior loan to the Bank of Kigali (BK) in order to meet it's need for long-term funding. BK's principal credit products are overdrafts, short, medium, and long-term loans. These are funded mainly by deposits with terms ranging from 1 -9 months and current accounts; both int
- Sector
- Manufacturing (Industrial), Water Supply and Storage, Hotel, Raw Materials, Government
- Location
- Rwanda
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Rwanda - Bank of Kigali
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed transaction is a US $ 12 million line of credit (LOC), split into USD 8 million as sub debt and USD 4 million as senior loan to the Bank of Kigali (BK) in order to meet it's need for long-term funding. BK's principal credit products are overdrafts, short, medium, and long-term loans. These are funded mainly by deposits with terms ranging from 1 -9 months and current accounts; both interest and non-interest bearing. The LOC, the first to BK from the ADB's private sector window, will support BK priority sectors, including agriculture, mining, manufacturing, energy and water, public works and construction, trade and tourism, communication and services. This line of credit, which runs for up to 10 years with a grace period of up to 2 years, will enable the Bank of Kigali to finance various sectors in the long term. |
Original sector | Banking & Financial Services |
Budget |
Location
Country | Rwanda |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Water Supply and Storage, Hotel, Raw Materials, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
