Rwanda - Cross Border Roads Upgrading Project, Phase I
Sector: Raw Materials • Location: Multinational
Source: African Development Bank (AfDB)
The Multinational (Rwanda/Burundi): Cross Border Roads Upgrading Project including construction of a One Stop Border Post (OSBP) at Akanyaru Haut Border has been prioritised by the two countries as part of addressing the missing road links. Indeed, missing links and poor transport infrastructure in Rwanda and Burundi are constraints to achieving the desired goals of the development strategies. The
- Sector
- Raw Materials, Commercial, Road, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Rwanda - Cross Border Roads Upgrading Project, Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Multinational (Rwanda/Burundi): Cross Border Roads Upgrading Project including construction of a One Stop Border Post (OSBP) at Akanyaru Haut Border has been prioritised by the two countries as part of addressing the missing road links. Indeed, missing links and poor transport infrastructure in Rwanda and Burundi are constraints to achieving the desired goals of the development strategies. The proposed project will enhance regional integration in the East African Community (EAC) by bridging vital links to the Central and the Northern Corridors and improving access to the sea for Burundi and Rwanda. Due to resource constraints, upgrading of the roads and construction of the OSBP will be completed in two phases. Phase 1 will comprise: Upgrading from gravel to bitumen 69km of roads in Rwanda (part of 213km Cross Border Roads in Rwanda), a Feasibility Study, and Detailed Engineering Designs (including ESIA, RAP, Gender impact assessments/analyses, business development opportunities’ study in the project area) of 65km of road in Burundi ; aa Feasibility Study, Detailed Engineering Design of a One Stop Border Post at Akanyaru Haut Border; and the provision of social infrastructure and related Services, and institutional support and capacity building of implementing agencies in the two countries. The actual construction and equipping of the One Stop Border Post Akanyaru Haut construction of the 65km of roads in Burundi (to be designed under phase 1), and remaining sections of Cross Border roads in Rwanda (about 144km) will be completed in Phase 2. The project primarily contributes to climate adaptation results. As such, 15% of the total approved amount is attributed as climate finance, of which 11 million USD is dedicated to adaptation. |
Original sector | Transport & Storage |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Road, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Multinational
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational Tanzania/ Rwanda - Feasibility Study of the Isaka-Kigali Railway Project
- Multinational - Sustainable Management of Endemic Ruminant Livestock in West Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Democratic Republic of Congo - Geographically-Integrated ECOMAKALA+ REDD Pilot Project
- PROJET DE GESTION DURABLE DU BETAIL RUMINANT ENDEMIQUE EN AFRIQUE DE L'OUEST(SENEGAL)
- Multinational - Development of forest byproducts and reforestation of degraded areas in central Africa
- Multinational - Sixth Line of Credit to East African Development Bank (EADB)