logo

Rwanda - Gitarama-Ngororero-Mukamira Road Project

Sector: Manufacturing (Industrial) • Location: Rwanda

Source: African Development Bank (AfDB)

Project

The Gitarama-Ngororero-Mukamira Road Project forms part of the priority road network of Rwanda and constitutes a key link in the Kigali-Gitarama-Mukamira Road. Its rehabilitation features in the Government’s priorities for the development of the Northern Region. The project doesn’t involve the construction of a new road, but rather the improvement of an existing road. Indeed, the Gitarama-Ngororer

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Gitarama-Ngororero-Mukamira Road Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Gitarama-Ngororero-Mukamira Road Project forms part of the priority road network of Rwanda and constitutes a key link in the Kigali-Gitarama-Mukamira Road. Its rehabilitation features in the Government’s priorities for the development of the Northern Region. The project doesn’t involve the construction of a new road, but rather the improvement of an existing road. Indeed, the Gitarama-Ngororero-Mukamira road, 102.6 km long, has many defects (ravelling, peeling, combing, potholes, subsidence, transversal and longitudinal cracks, distortions and rutting, serrated banks, etc.) with highly unstable embankments and structure of the fill. Furthermore, it has an inadequate drainage system (blocked culverts, ducts or ditches). The main outputs expected from the project are: a) 102.6 km of paved road in good condition, between Gitarama and Mukamira and 76 km of improved feeder roads; b) Putting in place of a road database; c) Equipment for road database, and equipment for laboratory and in-situ testing, procured, put in place and operating; d) Technical and operational capacities of the Roads Department(RD) strengthened and ; e) About 15,000 persons in the project area sensitized about problems relating to road safety, environmental protection, waterborne diseases (diarrhoea and malaria), and STDs including HIV/AIDS.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data