Rwanda - Gitarama-Ngororero-Mukamira Road Project
Sector: Manufacturing (Industrial) • Location: Rwanda
Source: African Development Bank (AfDB)
The Gitarama-Ngororero-Mukamira Road Project forms part of the priority road network of Rwanda and constitutes a key link in the Kigali-Gitarama-Mukamira Road. Its rehabilitation features in the Government’s priorities for the development of the Northern Region. The project doesn’t involve the construction of a new road, but rather the improvement of an existing road. Indeed, the Gitarama-Ngororer
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Gitarama-Ngororero-Mukamira Road Project forms part of the priority road network of Rwanda and constitutes a key link in the Kigali-Gitarama-Mukamira Road. Its rehabilitation features in the Government’s priorities for the development of the Northern Region. The project doesn’t involve the construction of a new road, but rather the improvement of an existing road. Indeed, the Gitarama-Ngororero-Mukamira road, 102.6 km long, has many defects (ravelling, peeling, combing, potholes, subsidence, transversal and longitudinal cracks, distortions and rutting, serrated banks, etc.) with highly unstable embankments and structure of the fill. Furthermore, it has an inadequate drainage system (blocked culverts, ducts or ditches). The main outputs expected from the project are: a) 102.6 km of paved road in good condition, between Gitarama and Mukamira and 76 km of improved feeder roads; b) Putting in place of a road database; c) Equipment for road database, and equipment for laboratory and in-situ testing, procured, put in place and operating; d) Technical and operational capacities of the Roads Department(RD) strengthened and ; e) About 15,000 persons in the project area sensitized about problems relating to road safety, environmental protection, waterborne diseases (diarrhoea and malaria), and STDs including HIV/AIDS. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
