Rwanda - Inland Lakes Integrated Development and Management Support Project (PAIGELAC)
Sector: Raw Materials • Location: Rwanda
Source: African Development Bank (AfDB)
The present intervention concerns the Inland Lakes Integrated Development and Management Support Project. It falls within the priority areas of the national poverty reduction strategy. The project should help build national capacities in the sustainable management of fish resources, ensure a lasting build up of fish stocks over 25,000 hectares of water bodies, protect 35,000 hectares of catchment
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present intervention concerns the Inland Lakes Integrated Development and Management Support Project. It falls within the priority areas of the national poverty reduction strategy. The project should help build national capacities in the sustainable management of fish resources, ensure a lasting build up of fish stocks over 25,000 hectares of water bodies, protect 35,000 hectares of catchment areas and induce an additional annual production of 10,000 tonnes of fish and 1,000 of pigs and poultry. At the economic level, the project should also generate savings in foreign exchange with the gradual substitution of fish imports estimated at RWF 1.8 billion annually. The project comprises three main components, namely: (i) institutional capacity building; (ii) improvement of production and marketing; and (iii) project management. The main expected outputs are: (i) building of the institutional capacities of fishery sub-sector operators, NGOs, fishery administration and local communities involved; (ii) integrated management of 25,000 hectares of water bodies and protection of 35,000 hectares of watersheds; (iii) increase in the national fish production by 10,000 tonnes per year, associated animals by 1,000 tonnes per year and the diversification of the activities of fishermen; and (iv) improvement of basic infrastructure, equipment and services. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
