logo

Rwanda - Inland Lakes Integrated Development and Management Support Project (PAIGELAC)

Sector: Raw Materials • Location: Rwanda

Source: African Development Bank (AfDB)

Project

The present intervention concerns the Inland Lakes Integrated Development and Management Support Project. It falls within the priority areas of the national poverty reduction strategy. The project should help build national capacities in the sustainable management of fish resources, ensure a lasting build up of fish stocks over 25,000 hectares of water bodies, protect 35,000 hectares of catchment

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Inland Lakes Integrated Development and Management Support Project (PAIGELAC)” is an infrastructure initiative in the Raw Materials sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention concerns the Inland Lakes Integrated Development and Management Support Project. It falls within the priority areas of the national poverty reduction strategy. The project should help build national capacities in the sustainable management of fish resources, ensure a lasting build up of fish stocks over 25,000 hectares of water bodies, protect 35,000 hectares of catchment areas and induce an additional annual production of 10,000 tonnes of fish and 1,000 of pigs and poultry. At the economic level, the project should also generate savings in foreign exchange with the gradual substitution of fish imports estimated at RWF 1.8 billion annually. The project comprises three main components, namely: (i) institutional capacity building; (ii) improvement of production and marketing; and (iii) project management. The main expected outputs are: (i) building of the institutional capacities of fishery sub-sector operators, NGOs, fishery administration and local communities involved; (ii) integrated management of 25,000 hectares of water bodies and protection of 35,000 hectares of watersheds; (iii) increase in the national fish production by 10,000 tonnes per year, associated animals by 1,000 tonnes per year and the diversification of the activities of fishermen; and (iv) improvement of basic infrastructure, equipment and services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data