logo

Rwanda - Institutional support project for environmental management (PAIGER)

Sector: Residential • Location: Rwanda

Source: African Development Bank (AfDB)

Project

The design of the Environmental Management Institutional Support Project in Rwanda results from ana analysis of environmental problems following the major population movements and their settlement in the forest ares and the drought that affected some parts of the country. It draws from the objectives set out in the programme to reduce poverty in Rwanda. More specifically, the project aims to build

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Institutional support project for environmental management (PAIGER)” is an infrastructure initiative in the Residential sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The design of the Environmental Management Institutional Support Project in Rwanda results from ana analysis of environmental problems following the major population movements and their settlement in the forest ares and the drought that affected some parts of the country. It draws from the objectives set out in the programme to reduce poverty in Rwanda. More specifically, the project aims to build Rwanda’s institutional capacity to manage the environment. Accordingly, the project will diagnose the environmental situation, put in place an environmental information system and train staff of the structures responsible for the environment, the Directorate of Environmental Protection, in particular. In its approach, the project gives priority to local-level participation spotlighting the motivation and commitment of the authorities though an involvement in project implementation. To carry out its activities, the project comprises the following components: (i) capacity building, (ii) creation of database and (iii) project management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data