Rwanda - Kigali III water supply study
Sector: Road • Location: Rwanda
Source: African Development Bank (AfDB)
The proposed study includes the preparation of construction plans, technical specifications and tender documents for the following works and structures: construction of a water intake structure on the Nysbarongo River, sludge traps, raw water pumping station. The studies and plans will focus on meeting Kigali's estimated water demand until 2010 and will need to define appropriate implementation st
- Sector
- Road, Water Supply and Storage, Government
- Location
- Rwanda
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Rwanda - Kigali III water supply study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed study includes the preparation of construction plans, technical specifications and tender documents for the following works and structures: construction of a water intake structure on the Nysbarongo River, sludge traps, raw water pumping station. The studies and plans will focus on meeting Kigali's estimated water demand until 2010 and will need to define appropriate implementation steps based on actual population growth. The purpose is to take into account new elements that have emerged in previous years, in particular: (i) the need to rehabilitate part of the capital's water supply infrastructure; (ii) the emergence of another route to fill the water supply gap in Kigali following the recent exploration of the Nyabarongo alluvial groundwater table. Thus, the study currently includes the following three phases: Phase 1: Assessment of current infrastructure and assessment of rehabilitation needs. Phase 2: Preparation of detailed design proposals (DPA) and tender documents (DAO). Phase 3: update of population studies and water demand by 2015, further study of the Nyabarongo alluvial groundwater table and Lake Muhazi and comparative studies of options for water resource mobilization as well as planning for the strengthening and extension of the distribution system by 2015. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Rwanda |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Rwanda
- Rwanda Stones & Construction Ltd.
- Kigali Bulk Water Supply Project
- Symbion Power Lake Kivu Limited
- Rwanda - Scaling Up Energy Access Project
- Development of National Electrification Plan and Investment analysis to undertake grid connected and off grid projects to improve Energy Access.
- Kigali - Ngoma Road
- Rwanda - Kayonza-Gabiro road project
- Rwanda: Rwanda Energy Results-Based Financing Program
