Rwanda - Kigali III water supply study
Sector: Road • Location: Rwanda
Source: African Development Bank (AfDB)
The proposed study includes the preparation of construction plans, technical specifications and tender documents for the following works and structures: construction of a water intake structure on the Nysbarongo River, sludge traps, raw water pumping station. The studies and plans will focus on meeting Kigali's estimated water demand until 2010 and will need to define appropriate implementation st
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed study includes the preparation of construction plans, technical specifications and tender documents for the following works and structures: construction of a water intake structure on the Nysbarongo River, sludge traps, raw water pumping station. The studies and plans will focus on meeting Kigali's estimated water demand until 2010 and will need to define appropriate implementation steps based on actual population growth. The purpose is to take into account new elements that have emerged in previous years, in particular: (i) the need to rehabilitate part of the capital's water supply infrastructure; (ii) the emergence of another route to fill the water supply gap in Kigali following the recent exploration of the Nyabarongo alluvial groundwater table. Thus, the study currently includes the following three phases: Phase 1: Assessment of current infrastructure and assessment of rehabilitation needs. Phase 2: Preparation of detailed design proposals (DPA) and tender documents (DAO). Phase 3: update of population studies and water demand by 2015, further study of the Nyabarongo alluvial groundwater table and Lake Muhazi and comparative studies of options for water resource mobilization as well as planning for the strengthening and extension of the distribution system by 2015. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
