logo

Rwanda - (Loan to KivuWatt Limited) - Lake Kivu Integrated Methane Gas Extraction and Power Production Facility

Sector: Geothermal • Location: Rwanda

Source: African Development Bank (AfDB)

Project

The KivuWatt Power Project is located in the Kibuye area of the District of Karongi, Western Province of Rwanda. It will use waters in Lake Kivu. The border between Rwanda and the Democratic Republic of the Congo bisects Lake Kivu. The KivuWatt project is located wholly within Rwandan territory. The project extracts methane from the waters of Lake Kivu and use the gas to generate electricity that

Project Information FAQ

Project Information

4 Q
The project “Rwanda - (Loan to KivuWatt Limited) - Lake Kivu Integrated Methane Gas Extraction and Power Production Facility” is an infrastructure initiative in the Geothermal sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The KivuWatt Power Project is located in the Kibuye area of the District of Karongi, Western Province of Rwanda. It will use waters in Lake Kivu. The border between Rwanda and the Democratic Republic of the Congo bisects Lake Kivu. The KivuWatt project is located wholly within Rwandan territory. The project extracts methane from the waters of Lake Kivu and use the gas to generate electricity that will be sold to the Rwanda electricity utility, Rwanda Electricity Corporation (RECO). Phase 1 of the project, which will generate 25MW, is expected to start commercial operation in 2012. The methane gas produced in Phase 1 will initially be used to power three gas engine generator sets, ‘Gas Extraction Facilities’ (GEFs). Phase 2 of the project, which will generate an additional 75 MW employing nine additional GEFs to expand KivuWatt to just over 100 MW of power, is expected to start construction six months after Phase 1 is commissioned.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data