Rwanda - (Loan to KivuWatt Limited) - Lake Kivu Integrated Methane Gas Extraction and Power Production Facility
Sector: Geothermal • Location: Rwanda
Source: African Development Bank (AfDB)
The KivuWatt Power Project is located in the Kibuye area of the District of Karongi, Western Province of Rwanda. It will use waters in Lake Kivu. The border between Rwanda and the Democratic Republic of the Congo bisects Lake Kivu. The KivuWatt project is located wholly within Rwandan territory. The project extracts methane from the waters of Lake Kivu and use the gas to generate electricity that
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The KivuWatt Power Project is located in the Kibuye area of the District of Karongi, Western Province of Rwanda. It will use waters in Lake Kivu. The border between Rwanda and the Democratic Republic of the Congo bisects Lake Kivu. The KivuWatt project is located wholly within Rwandan territory. The project extracts methane from the waters of Lake Kivu and use the gas to generate electricity that will be sold to the Rwanda electricity utility, Rwanda Electricity Corporation (RECO). Phase 1 of the project, which will generate 25MW, is expected to start commercial operation in 2012. The methane gas produced in Phase 1 will initially be used to power three gas engine generator sets, ‘Gas Extraction Facilities’ (GEFs). Phase 2 of the project, which will generate an additional 75 MW employing nine additional GEFs to expand KivuWatt to just over 100 MW of power, is expected to start construction six months after Phase 1 is commissioned. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
