Rwanda - Regional Rusumo Falls Hydropower Project

Sector: Water Supply and Storage • Location: Multinational

Source: African Development Bank (AfDB)

The Regional Rusumo Falls Hydropower Project development is a transformative generation and transmission integration initiative that would enable Tanzania, Rwanda and Burundi to jointly have access to the benefits of the large and diverse potential of the region’s energy sources. The overall project are two main components: (i) an 80 MW hydropower generation plant at an estimated cost of US$ 340 m

Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Rwanda - Regional Rusumo Falls Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Regional Rusumo Falls Hydropower Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Regional Rusumo Falls Hydropower Project development is a transformative generation and transmission integration initiative that would enable Tanzania, Rwanda and Burundi to jointly have access to the benefits of the large and diverse potential of the region’s energy sources. The overall project are two main components: (i) an 80 MW hydropower generation plant at an estimated cost of US$ 340 million; and (ii) transmission lines and substations at a total estimated cost of US$ 121 million. The 80 MW of power generated will be shared equally by the three countries. Its implementation will increase renewable (hydro) electricity supply capacity to address the power deficit and allow the countries to address their low energy access rates. Rwanda and Tanzania will be able to displace some of the energy generated from high cost imported fuel with cheaper hydro power; thereby contributing to the reduction of the current electricity tariff. In Burundi, the project will provide 50% of the current peak power demand and this will allow the country to expand its access and other economic activities, and reduce CO2 emissions considerably. AfDB Group allocated a total of UA 64.492 million from ADF and UA 6.5 million from NTF resources. An additional UA 10.73 million from the EU–Africa Infrastructure Trust Fund towards finance the transmission lines component from the Rusumo Falls Hydroelectric Plant to the national networks of Rwanda, Burundi and Tanzania. It's expected to be implemented and completed by August 2018.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project