logo

Rwanda - Regional Rusumo Falls Hydropower Project

Sector: Water Supply and Storage • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Regional Rusumo Falls Hydropower Project development is a transformative generation and transmission integration initiative that would enable Tanzania, Rwanda and Burundi to jointly have access to the benefits of the large and diverse potential of the region’s energy sources. The overall project are two main components: (i) an 80 MW hydropower generation plant at an estimated cost of US$ 340 m

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Regional Rusumo Falls Hydropower Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Regional Rusumo Falls Hydropower Project development is a transformative generation and transmission integration initiative that would enable Tanzania, Rwanda and Burundi to jointly have access to the benefits of the large and diverse potential of the region’s energy sources. The overall project are two main components: (i) an 80 MW hydropower generation plant at an estimated cost of US$ 340 million; and (ii) transmission lines and substations at a total estimated cost of US$ 121 million. The 80 MW of power generated will be shared equally by the three countries. Its implementation will increase renewable (hydro) electricity supply capacity to address the power deficit and allow the countries to address their low energy access rates. Rwanda and Tanzania will be able to displace some of the energy generated from high cost imported fuel with cheaper hydro power; thereby contributing to the reduction of the current electricity tariff. In Burundi, the project will provide 50% of the current peak power demand and this will allow the country to expand its access and other economic activities, and reduce CO2 emissions considerably. AfDB Group allocated a total of UA 64.492 million from ADF and UA 6.5 million from NTF resources. An additional UA 10.73 million from the EU–Africa Infrastructure Trust Fund towards finance the transmission lines component from the Rusumo Falls Hydroelectric Plant to the national networks of Rwanda, Burundi and Tanzania. It's expected to be implemented and completed by August 2018.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data