logo
Project

RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)

Sector: Manufacturing (Industrial) • Location: Rwanda

Source: African Development Bank (AfDB)

The proposed program is a results-based financing (RBF) operation and is anchored on Rwanda’s Energy Sector Strategic Plan (ESSP II) 2024–2029. The program will support the country in carrying out its electrification program with the aim of improving the quality of life of residents and promoting businesses, thus contributing to economic growth and poverty reduction in Rwanda. The proposed RBF wil

Sector
Manufacturing (Industrial), Commercial, Power Generation (CCGT), Hydro, Road, Government
Location
Rwanda
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed program is a results-based financing (RBF) operation and is anchored on Rwanda’s Energy Sector Strategic Plan (ESSP II) 2024–2029. The program will support the country in carrying out its electrification program with the aim of improving the quality of life of residents and promoting businesses, thus contributing to economic growth and poverty reduction in Rwanda. The proposed RBF will be the Bank’s second in Rwanda’s energy sector following the first one that is a three (3) year program based on the Country’s ESSP 2018/19 – 2023/24 adjudged “Satisfactory”. In summary, the first RBF has contributed to an additional 83,891 household grid connection, 354,145 off-grid household connections, 3,125 productive use connections, and at the level of outcomes contributed to increasing the national electricity access rate from 44% in 2018 to 78.9% in 2024 and reducing the power system losses from 21% to 18% during the same period. The new RBF builds on the lessons of this first RBF and will continue to support the government in accelerating access targets. The proposed EUR 260.76 million RBF II will be implemented over a period of 2025/26 to 2029/30 fiscal years with three main Results Areas which will all contribute directly to the achievement of the ESSP-II.

Original sector

Energy

Budget

Location

Country

Rwanda

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Power Generation (CCGT), Hydro, Road, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project