RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)
Sector: Manufacturing (Industrial) • Location: Rwanda
Source: African Development Bank (AfDB)
The proposed program is a results-based financing (RBF) operation and is anchored on Rwanda’s Energy Sector Strategic Plan (ESSP II) 2024–2029. The program will support the country in carrying out its electrification program with the aim of improving the quality of life of residents and promoting businesses, thus contributing to economic growth and poverty reduction in Rwanda. The proposed RBF wil
- Sector
- Manufacturing (Industrial), Commercial, Power Generation (CCGT), Hydro, Road, Government
- Location
- Rwanda
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed program is a results-based financing (RBF) operation and is anchored on Rwanda’s Energy Sector Strategic Plan (ESSP II) 2024–2029. The program will support the country in carrying out its electrification program with the aim of improving the quality of life of residents and promoting businesses, thus contributing to economic growth and poverty reduction in Rwanda. The proposed RBF will be the Bank’s second in Rwanda’s energy sector following the first one that is a three (3) year program based on the Country’s ESSP 2018/19 – 2023/24 adjudged “Satisfactory”. In summary, the first RBF has contributed to an additional 83,891 household grid connection, 354,145 off-grid household connections, 3,125 productive use connections, and at the level of outcomes contributed to increasing the national electricity access rate from 44% in 2018 to 78.9% in 2024 and reducing the power system losses from 21% to 18% during the same period. The new RBF builds on the lessons of this first RBF and will continue to support the government in accelerating access targets. The proposed EUR 260.76 million RBF II will be implemented over a period of 2025/26 to 2029/30 fiscal years with three main Results Areas which will all contribute directly to the achievement of the ESSP-II. |
Original sector | Energy |
Budget |
Location
Country | Rwanda |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Power Generation (CCGT), Hydro, Road, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
