logo

RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)

Sector: Manufacturing (Industrial) • Location: Rwanda

Source: African Development Bank (AfDB)

Project

The proposed program is a results-based financing (RBF) operation and is anchored on Rwanda’s Energy Sector Strategic Plan (ESSP II) 2024–2029. The program will support the country in carrying out its electrification program with the aim of improving the quality of life of residents and promoting businesses, thus contributing to economic growth and poverty reduction in Rwanda. The proposed RBF wil

Project Information FAQ

Project Information

4 Q
The project “RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed program is a results-based financing (RBF) operation and is anchored on Rwanda’s Energy Sector Strategic Plan (ESSP II) 2024–2029. The program will support the country in carrying out its electrification program with the aim of improving the quality of life of residents and promoting businesses, thus contributing to economic growth and poverty reduction in Rwanda. The proposed RBF will be the Bank’s second in Rwanda’s energy sector following the first one that is a three (3) year program based on the Country’s ESSP 2018/19 – 2023/24 adjudged “Satisfactory”. In summary, the first RBF has contributed to an additional 83,891 household grid connection, 354,145 off-grid household connections, 3,125 productive use connections, and at the level of outcomes contributed to increasing the national electricity access rate from 44% in 2018 to 78.9% in 2024 and reducing the power system losses from 21% to 18% during the same period. The new RBF builds on the lessons of this first RBF and will continue to support the government in accelerating access targets. The proposed EUR 260.76 million RBF II will be implemented over a period of 2025/26 to 2029/30 fiscal years with three main Results Areas which will all contribute directly to the achievement of the ESSP-II.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data