Project

The proposed operation is an ADF Loan for UA 26.08 million and ADF Grant for 33.65 million to the Republic of Rwanda, to finance the Transmission System Reinforcement and Last Mile Connectivity Project (TSRLMC). The TSRLMC Project is designed as part of the USD 670 million multidoor Rwanda Universal Energy Access program that is being co-financed by the World Bank Group (WBG), OPEC Fund for Intern

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Rwanda Transmission System Reinforcement and Last Mile Connectivity” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed operation is an ADF Loan for UA 26.08 million and ADF Grant for 33.65 million to the Republic of Rwanda, to finance the Transmission System Reinforcement and Last Mile Connectivity Project (TSRLMC). The TSRLMC Project is designed as part of the USD 670 million multidoor Rwanda Universal Energy Access program that is being co-financed by the World Bank Group (WBG), OPEC Fund for International Development (OFID), Saudi Fund for Development (SFD), Agence Française de Développement (AFD), and the European Investment Bank (EIB). The Bank’s contribution will represent 40% of the program costs. The Project complements Bank’s on going transmission, on grid and off grid initiatives in the sector as well as benefit from further consolidating its leadership role as Chair of Access Energy Sector Working Group. It meets the desires of the beneficiaries (project area communities and Government Agencies) who acknowledge lack of electricity access and /or insufficient electricity supply as affecting their social wellbeing and hindering socio-economic development. Key Project components include: (i) last mile grid access, by installing 595 km of Medium Voltage (MV) distribution lines, 1,620 km Low Voltage (LV) networks, installing 585 distribution transformers; (ii) distribution network reinforcement, installing 1,720 km of LV, 563 MV lines and 658 transformers; (iii) transmission line (137 km of 110 kV line) and substations construction; (iv) project engineering, supervision, feasibility study and audit; (v) project implementation; and (vi) Environmental and Social Management Framework (ESMF) and Resettlement Action Plan (RAP) implementation. The project primely contributes towards climate mitigation result. As such 70% of the total approval is attributed as climate finance, out of which USD 127 milion is mitigation finance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data