Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)
Sector: Manufacturing (Industrial) • Location: Rwanda
Source: African Development Bank (AfDB)
The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is t
- Sector
- Manufacturing (Industrial), Commercial, Power Generation (CCGT), Government
- Location
- Rwanda
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is the first operation of its kind designed to use the RBF instrument on a pilot basis. The intervention has been prepared in response to a formal request submitted by the GoR in April 2018 where they expressed readiness to pilot the RBF and in a revised version of July 2018 where they applied to allocate more resources for the program. The RBF will cover the first three years of the Energy Sector Strategy Plan (ESSP)’s period (2018-2024), for an amount of EUR229.2M or about 8.1% of the ESSP financing. The expansion and rehabilitation of the distribution network as well as the improvements in reliability will contribute to making more electricity available for consumers in the region. |
Original sector | Energy |
Budget |
Location
Country | Rwanda |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
