logo
Project

Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)

Sector: Manufacturing (Industrial) • Location: Rwanda

Source: African Development Bank (AfDB)

The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is t

Sector
Manufacturing (Industrial), Commercial, Power Generation (CCGT), Government
Location
Rwanda
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is the first operation of its kind designed to use the RBF instrument on a pilot basis. The intervention has been prepared in response to a formal request submitted by the GoR in April 2018 where they expressed readiness to pilot the RBF and in a revised version of July 2018 where they applied to allocate more resources for the program. The RBF will cover the first three years of the Energy Sector Strategy Plan (ESSP)’s period (2018-2024), for an amount of EUR229.2M or about 8.1% of the ESSP financing. The expansion and rehabilitation of the distribution network as well as the improvements in reliability will contribute to making more electricity available for consumers in the region.

Original sector

Energy

Budget

Location

Country

Rwanda

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Power Generation (CCGT), Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project