logo

Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)

Sector: Manufacturing (Industrial) • Location: Rwanda

Source: African Development Bank (AfDB)

Project

The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is t

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is the first operation of its kind designed to use the RBF instrument on a pilot basis. The intervention has been prepared in response to a formal request submitted by the GoR in April 2018 where they expressed readiness to pilot the RBF and in a revised version of July 2018 where they applied to allocate more resources for the program. The RBF will cover the first three years of the Energy Sector Strategy Plan (ESSP)’s period (2018-2024), for an amount of EUR229.2M or about 8.1% of the ESSP financing. The expansion and rehabilitation of the distribution network as well as the improvements in reliability will contribute to making more electricity available for consumers in the region.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data