Rwanda - Scaling Up Electricity Access Program Phase II (SEAP II)
Sector: Manufacturing (Industrial) • Location: Rwanda
Source: African Development Bank (AfDB)
The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The second phase of the Scaling Up Electricity Access Program (SEAP II) in Rwanda, is a three-year Results Based Financing (RBF) program starting in 2018 with the loan allocation as follows: 28.05% to improve power system reliability, 64.48 % to increase on-grid access, 3.80 % to increase offgrid access, 2.67% to strengthen institutions and for capacity building and technical assistance. This is the first operation of its kind designed to use the RBF instrument on a pilot basis. The intervention has been prepared in response to a formal request submitted by the GoR in April 2018 where they expressed readiness to pilot the RBF and in a revised version of July 2018 where they applied to allocate more resources for the program. The RBF will cover the first three years of the Energy Sector Strategy Plan (ESSP)’s period (2018-2024), for an amount of EUR229.2M or about 8.1% of the ESSP financing. The expansion and rehabilitation of the distribution network as well as the improvements in reliability will contribute to making more electricity available for consumers in the region. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
