Rwanda - Scaling Up Energy Access Project

Sector: Manufacturing (Industrial) • Location: Rwanda

Source: African Development Bank (AfDB)

The proposed Scaling-Up Energy Access project covers the Northern and Western provinces of Rwanda. The project will: (i) upgrade and rehabilitate two existing substations in Northern Province, the Gifurwe substation to 10MVA capacity and the Rulindo substation (also to be relocated) to 20MVA capacity; (ii) build about 464 km of medium voltage (MV) and 710 km of low-voltage (LV) distribution networ

Sector
Manufacturing (Industrial), Commercial, Water Supply and Storage, Power Generation (CCGT), Government
Location
Rwanda
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Rwanda - Scaling Up Energy Access Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Scaling Up Energy Access Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed Scaling-Up Energy Access project covers the Northern and Western provinces of Rwanda. The project will: (i) upgrade and rehabilitate two existing substations in Northern Province, the Gifurwe substation to 10MVA capacity and the Rulindo substation (also to be relocated) to 20MVA capacity; (ii) build about 464 km of medium voltage (MV) and 710 km of low-voltage (LV) distribution networks in both provinces; and (iii) connect 25,438 households and priority institutions (179 schools, 29 health centers and 25 sector administration offices) to the grid along the constructed distribution network areas. Construction is expected to be implemented over a period of 24 months after contract effectiveness and to be completed by August 2017. The project’s cost is estimated at UA 29.961 million. Its beneficiaries are mainly rural Rwandans, who will gain access to cheaper, reliable and sustainable electricity and related improved services.

Original sector

Energy

Budget

Location

Country

Rwanda

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Water Supply and Storage, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project