Rwanda - Scaling Up Energy Access Project

Sector: Manufacturing (Industrial) • Location: Rwanda

Source: African Development Bank (AfDB)

Project

The proposed Scaling-Up Energy Access project covers the Northern and Western provinces of Rwanda. The project will: (i) upgrade and rehabilitate two existing substations in Northern Province, the Gifurwe substation to 10MVA capacity and the Rulindo substation (also to be relocated) to 20MVA capacity; (ii) build about 464 km of medium voltage (MV) and 710 km of low-voltage (LV) distribution networ

Project Information FAQ

Project Information

4 Q
The project “Rwanda - Scaling Up Energy Access Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Scaling-Up Energy Access project covers the Northern and Western provinces of Rwanda. The project will: (i) upgrade and rehabilitate two existing substations in Northern Province, the Gifurwe substation to 10MVA capacity and the Rulindo substation (also to be relocated) to 20MVA capacity; (ii) build about 464 km of medium voltage (MV) and 710 km of low-voltage (LV) distribution networks in both provinces; and (iii) connect 25,438 households and priority institutions (179 schools, 29 health centers and 25 sector administration offices) to the grid along the constructed distribution network areas. Construction is expected to be implemented over a period of 24 months after contract effectiveness and to be completed by August 2017. The project’s cost is estimated at UA 29.961 million. Its beneficiaries are mainly rural Rwandans, who will gain access to cheaper, reliable and sustainable electricity and related improved services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data