logo
ProjectApproved

Rwanda: Accelerating Sustainable and Clean Energy Transformation (ASCENT) Rwanda

The status, timeline and source of this project. A free account opens every field.

Source: Asian Infrastructure Investment Bank (AIIB)

The Project will increase access of households and businesses to less carbon intensive and lower greenhouse gas (GHG) emitting sources of energy by increasing grid electrification and enhancing the availability of and access to clean cooking solutions. The Project comprises: (i) provision of grid-based electricity connections through grid densification in areas already covered by the grid and thro

Status
Prospective
Sector
Energy Storage, Power Generation (CCGT), Biomass, Solar, Commercial, Waste Processing and Treatment, Residential, Government
Location
Rwanda
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Rwanda: Accelerating Sustainable and Clean Energy Transformation (ASCENT) Rwanda

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rwanda: Accelerating Sustainable and Clean Energy Transformation (ASCENT) Rwanda” is an infrastructure initiative in the Energy Storage sector, located in Rwanda. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project will increase access of households and businesses to less carbon intensive and lower greenhouse gas (GHG) emitting sources of energy by increasing grid electrification and enhancing the availability of and access to clean cooking solutions. The Project comprises: (i) provision of grid-based electricity connections through grid densification in areas already covered by the grid and through grid extension to new areas; (ii) provision of off-grid electricity solutions; and (iii) provision of clean cooking solutions. Specifically, the Project scope involves: 1. Provision of 420,000 grid connections including related backbone infrastructure. 2. Upgrade of four 110/30kV and two 110/15kV transformers in five existing substations; construction of one 110/30kV substation, two 20 megavolt-amperes (MVA) transformers and one 110kV transmission line (21km); construction of one 220kV transmission line (56km); construction of four 30/15kV, 5MVA substations and associated medium voltage (MV) feeder lines; construction of three MV switching cabins; and extension and/or upgrade of 160km of MV lines and rehabilitation of low voltage (LV) lines in Kigali City, Southern Province and Western Province, to reinforce the transmission and distribution system and increase system efficiency and reliability. 3. Provision of at least 50,000 solar home systems (SHS), 80,000 household clean cooking technologies and 60 institutional clean cooking solutions. The Project will be jointly co-financed with the World Bank (WB) as the lead cofinancer.

Original sector

Energy

Budget

Location

Country

Rwanda

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Biomass, Solar, Commercial, Waste Processing and Treatment, Residential, Government

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project