logo

Rwanda Electricity Sector Strengthening Project

Sector: Power Transmission • Location: Rwanda

Source: World Bank

Project
Closed

The objective of the Electricity Sector Strengthening Project for Rwanda is to enhance the operational efficiency of the utility and increase electricity access. The project has three components: component A, electricity sector capacity strengthening; component B, increased access to electricity services; and component C, technical assistance and project implementation support. Component A will su

Project Information FAQ

Project Information

5 Q
The project “Rwanda Electricity Sector Strengthening Project” is an infrastructure initiative in the Power Transmission sector, located in Rwanda. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Electricity Sector Strengthening Project for Rwanda is to enhance the operational efficiency of the utility and increase electricity access. The project has three components: component A, electricity sector capacity strengthening; component B, increased access to electricity services; and component C, technical assistance and project implementation support. Component A will support EUCL to establish a comprehensive MIS to ensure efficient, transparent, and accountable processes covering network operations and maintenance (O&M); commercial functions; and management of corporate resources. The primary activities will include the design, supply, installation, and operationalization (including staff training) of an integrated MIS with several modules covering commercial, network operation, and corporate functions. Component B will support electricity connections of new consumers all over Rwanda and network reinforcements, where required, to ensure that network expansion does not compromise the quality of supply; and strengthening of the Kigali 15KV distribution network to provide sufficient capacity to meet increased demand from new economic activities. Kigali City and its environs constitute the biggest load center in Rwanda, currently consuming about 57 percent of the total energy supplied to the national grid. Component C will support studies to enhance sector performance and sector development, especially as related to grid supply and reliability, as well as providing support for project management and the SWG.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data