logo

Rwanda Energy Sector Rehabilitation and Urban Waste Management

Sector: Solar • Location: Rwanda

Source: World Bank Group

Project
Closed

The overall objective of the project is to promote rational energy policies and to establish the basis for efficient utilization of Rwanda's energy resources, while minimizing adverse environmental implications. The project comprises two main components: (a) strengthening of the institutional regulatory and policy environment; and (b) rehabilitation of key infrastructure in the power subsector. Th

Project Information FAQ

Project Information

5 Q
The project “Rwanda Energy Sector Rehabilitation and Urban Waste Management” is an infrastructure initiative in the Solar sector, located in Rwanda. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The overall objective of the project is to promote rational energy policies and to establish the basis for efficient utilization of Rwanda's energy resources, while minimizing adverse environmental implications. The project comprises two main components: (a) strengthening of the institutional regulatory and policy environment; and (b) rehabilitation of key infrastructure in the power subsector. The first component will include: (i) restructuring the Rwandese Utility Company to permit contracting out its operations to a private operator; (ii) consulting services to prepare new statutes and organization chart for the utility and bidding documents for the selection of the private operator, and to assist in implementing its contracting under a lease type contract and in establishing two companies; (iii) implementation of a series of make-ready measures in order to attract qualified private operators; (iv) introduction of incentives to rationalize and improve the efficiency of the charcoal subsector; (v) implementation of environmental and technical guidelines for future development of Lake Kivu's methane gas by private investors; (vi) studies to design and implement a strategy for development of solar home systems as a cost-efficient alternative for electricity in rural areas; and (vii) technical assistance and training to strengthen the Ministry of Commerce, Industry and Handicrafts's capacity to deal with petroleum products issues. The power subsector component includes: (i) rehabilitation and improvements of key power infrastructure for five cities; (ii) improvement in the medium voltage sections; (iii) overhauls of power station and hydraulic structures; (iv) feasibility studies for hydroplants; (v) constitution of a strategic stock of spare parts for plants and substations; and (vi) capacity building and training through scholarships and strengthening of the investment planning and monitoring capacity of the utility staff.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data