Rwanda Mountain Tea Giciye SHPP
Sector: Hydro • Location: Western, Rwanda
Source: World Bank Group
Rwanda Mountain Tea, a Rwandese tea processing company, was planning the construction of a 4.5MW Giciye Mini Hydropower Plant, part of the output was to be fed into the national grid. The plant was to be located on the Giciye River, Nyabihu region. The project was to consist of 2 Pelton turbines, 2.0MW each.
The developer was to sell the surplus output to the national energy and water utility EWS
- Status
- Prospective
- Sector
- Hydro, Wind, Manufacturing (Industrial), Power Transmission, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Western, Rwanda
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Rwanda Mountain Tea Giciye SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rwanda Mountain Tea, a Rwandese tea processing company, was planning the construction of a 4.5MW Giciye Mini Hydropower Plant, part of the output was to be fed into the national grid. The plant was to be located on the Giciye River, Nyabihu region. The project was to consist of 2 Pelton turbines, 2.0MW each. The developer was to sell the surplus output to the national energy and water utility EWSA. The percentage surplus was unknown. The company signed an EPC contract with Horizon Group. Horizon Group was expecting to partner with the Tanzanian electricity production firm Aquifer. Construction was expected to last 18 months, and start in February 2012, implying a commissioning date not before late-2013. The project was partly captured, feeding electricity to nearby factories of tea producers. Total cost was estimated at $12 million. The sponsor received assistance from the Dutch development organization FMO. The project applied for UNFCCC CDM funding Project coordinates were: 141’09.66”S and 29 34’30.39” http://www.ccap.org/blog/tag/hydroelectric/ http://www.esi-africa.com/node/13986 http://www.cdmloanscheme.org/sites/default/files/giciye_hydro_power_project.pdf http://energy4africa.net/ http://www.rwandaenergy.com/2012/01/nyabihu-hydro-power-dam-worth-12-million-to-be-constructed-along-giciye-river/ |
Original sector | Energy |
Budget |
Location
Country | Rwanda |
State | Western |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Manufacturing (Industrial), Power Transmission, Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2024-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Rwanda
- Musanze Hydropower Plant
- Rwanda Mountain Tea Giciye SHPP
- Electrogaz
- Rwanda - Muvumba Multipurpose Water Resources Development Program
- Rwanda - Skills development in the energy sector (FAPA-Technical Assistance)
- RWANDA - Rwanda Energy Sector Results Based Financing (RBF II)
- Electrogaz
- Rwanda Mountain Tea Giciye SHPP
