logo

Rwanda Mountain Tea Giciye SHPP

Sector: Hydro • Location: Western, Rwanda

Source: World Bank Group

Project
Active

Rwanda Mountain Tea, a Rwandese tea processing company, was planning the construction of a 4.5MW Giciye Mini Hydropower Plant, part of the output was to be fed into the national grid. The plant was to be located on the Giciye River, Nyabihu region. The project was to consist of 2 Pelton turbines, 2.0MW each.

The developer was to sell the surplus output to the national energy and water utility EWS

Status
Prospective
Sector
Hydro, Wind, Manufacturing (Industrial), Power Transmission, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
Location
Western, Rwanda
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Rwanda Mountain Tea Giciye SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rwanda Mountain Tea Giciye SHPP” is an infrastructure initiative in the Hydro sector, located in Western, Rwanda. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rwanda Mountain Tea, a Rwandese tea processing company, was planning the construction of a 4.5MW Giciye Mini Hydropower Plant, part of the output was to be fed into the national grid. The plant was to be located on the Giciye River, Nyabihu region. The project was to consist of 2 Pelton turbines, 2.0MW each. The developer was to sell the surplus output to the national energy and water utility EWSA. The percentage surplus was unknown. The company signed an EPC contract with Horizon Group. Horizon Group was expecting to partner with the Tanzanian electricity production firm Aquifer. Construction was expected to last 18 months, and start in February 2012, implying a commissioning date not before late-2013. The project was partly captured, feeding electricity to nearby factories of tea producers. Total cost was estimated at $12 million. The sponsor received assistance from the Dutch development organization FMO. The project applied for UNFCCC CDM funding Project coordinates were: 141’09.66”S and 29 34’30.39” http://www.ccap.org/blog/tag/hydroelectric/ http://www.esi-africa.com/node/13986 http://www.cdmloanscheme.org/sites/default/files/giciye_hydro_power_project.pdf http://energy4africa.net/ http://www.rwandaenergy.com/2012/01/nyabihu-hydro-power-dam-worth-12-million-to-be-constructed-along-giciye-river/

Original sector

Energy

Budget

Location

Country

Rwanda

State

Western

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Manufacturing (Industrial), Power Transmission, Water Supply and Storage, Power Generation (CCGT), Commercial, Government

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project