logo

Rwanda: Rwanda Energy Results-Based Financing Program

Sector: Water Supply and Storage • Location: Rwanda

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The results-based financing (RBF) project is a five-year project with three main results areas namely: Improved system reliability and network strengthening, Increased access to grid and off-grid electricity to improve livelihood and safety, and Institutional strengthening and capacity building to contribute to the Government of Rwanda's targets of universal access to electricity by 2029. The RBF

Project Information FAQ

Project Information

5 Q
The project “Rwanda: Rwanda Energy Results-Based Financing Program” is an infrastructure initiative in the Water Supply and Storage sector, located in Rwanda. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The results-based financing (RBF) project is a five-year project with three main results areas namely: Improved system reliability and network strengthening, Increased access to grid and off-grid electricity to improve livelihood and safety, and Institutional strengthening and capacity building to contribute to the Government of Rwanda's targets of universal access to electricity by 2029. The RBF Project will increase the access of households and businesses to less carbon intensive and lower greenhouse gas (GHG) emitting sources of energy. The Project comprises: (i) distribution network rehabilitation and reinforcement; (ii) provision of clean energy access through grid and off-grid connections, clean cooking technologies and streetlighting; and (iii) enhancement of institutional capacity to deliver universal electricity access. The Project will be jointly co-financed with the African Development Bank (AfDB) as the lead co-financer. Specifically, the scope involves: Rehabilitation of Musanze, Gikondo, Jabana and Gasogi substations and construction of 3,855 km of MV and LV length of connections as well as 138 units of distribution transformers; Provision of 200,000 grid connections, including associated distribution backbone infrastructure, and 50,000 off-grid connections through solar home systems; Provision of clean cooking technologies to 100,000 households and 310 public institutions; Provision of productive use equipment and appliances to 850 users; Provision of 250km of streetlights along roads in secondary cities; Delivery of a Clean Cooking strategy & implementation plan and enhanced E&S monitoring under the RBF reporting, along with relevant capacity building programs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data