Rwanda: Rwanda Energy Results-Based Financing Program

Sector: Water Supply and Storage • Location: Rwanda

Source: Asian Infrastructure Investment Bank (AIIB)

The results-based financing (RBF) project is a five-year project with three main results areas namely: Improved system reliability and network strengthening, Increased access to grid and off-grid electricity to improve livelihood and safety, and Institutional strengthening and capacity building to contribute to the Government of Rwanda's targets of universal access to electricity by 2029. The RBF

Status
Prospective
Sector
Water Supply and Storage, Energy Storage, Power Transmission, Automotive, Biomass, Solar, Consumer Products, Road, Power Generation (CCGT), Oil and Gas, Waste Processing and Treatment, Government, Education, Residential, Commercial
Location
Rwanda
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Rwanda: Rwanda Energy Results-Based Financing Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rwanda: Rwanda Energy Results-Based Financing Program” is an infrastructure initiative in the Water Supply and Storage sector, located in Rwanda. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The results-based financing (RBF) project is a five-year project with three main results areas namely: Improved system reliability and network strengthening, Increased access to grid and off-grid electricity to improve livelihood and safety, and Institutional strengthening and capacity building to contribute to the Government of Rwanda's targets of universal access to electricity by 2029. The RBF Project will increase the access of households and businesses to less carbon intensive and lower greenhouse gas (GHG) emitting sources of energy. The Project comprises: (i) distribution network rehabilitation and reinforcement; (ii) provision of clean energy access through grid and off-grid connections, clean cooking technologies and streetlighting; and (iii) enhancement of institutional capacity to deliver universal electricity access. The Project will be jointly co-financed with the African Development Bank (AfDB) as the lead co-financer. Specifically, the scope involves: Rehabilitation of Musanze, Gikondo, Jabana and Gasogi substations and construction of 3,855 km of MV and LV length of connections as well as 138 units of distribution transformers; Provision of 200,000 grid connections, including associated distribution backbone infrastructure, and 50,000 off-grid connections through solar home systems; Provision of clean cooking technologies to 100,000 households and 310 public institutions; Provision of productive use equipment and appliances to 850 users; Provision of 250km of streetlights along roads in secondary cities; Delivery of a Clean Cooking strategy & implementation plan and enhanced E&S monitoring under the RBF reporting, along with relevant capacity building programs.

Original sector

Energy

Budget

Location

Country

Rwanda

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Energy Storage, Power Transmission, Automotive, Biomass, Solar, Consumer Products, Road, Power Generation (CCGT), Oil and Gas, Waste Processing and Treatment, Government, Education, Residential, Commercial

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project