RWC Pasco
Construction documents · Washington · Last reported Mar 2025
Source: Dodge
A new 39,000sf PEMB. Inside the 39,000sf footprint includes an 8,563-sf office, 19,500-sf repair garage, and a 10,937-sf parts storage area. The new building will be a semi-truck dealership. Work includes all associated improvements for utilities, drainage, and erosion control measures necessary for the project.
- Status
- Closed
- Sector
- Residential, Manufacturing (Industrial), Power Transmission, Warehouse, Car parking, Metal, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Automotive
- Location
- Pasco, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RWC Pasco
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A new 39,000sf PEMB. Inside the 39,000sf footprint includes an 8,563-sf office, 19,500-sf repair garage, and a 10,937-sf parts storage area. The new building will be a semi-truck dealership. Work includes all associated improvements for utilities, drainage, and erosion control measures necessary for the project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Pasco |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Manufacturing (Industrial), Power Transmission, Warehouse, Car parking, Metal, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
