RY-AL MUKALLA WATER SUPPLY
One of 475 projects Taiyo tracks in Yemen, Republic of.
Source: World Bank Group
The project aims to increase water production for Al Mukalla to the level required to meet effective demand to the year 2002 and to strengthen and expand the existing primary and secondary distribution systems. In order to achieve these objectives, the project is composed of the following components; (1) drilling and equipping of a borefield at An Naga'ah, together with associated works, (2) a tra
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Residential, Government, Commercial
- Location
- Yemen
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RY-AL MUKALLA WATER SUPPLY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to increase water production for Al Mukalla to the level required to meet effective demand to the year 2002 and to strengthen and expand the existing primary and secondary distribution systems. In order to achieve these objectives, the project is composed of the following components; (1) drilling and equipping of a borefield at An Naga'ah, together with associated works, (2) a transmission pipeline from the borefield to Al Mukalla, (3) re-equipping and upgrading of the Wadi Buwaysh borefield, (4) improvement and strengthening of primary and secondary water distribution networks. The project further provides for the supply of water meters, tools, and operational and office equipment, (6) construction and rehabilitation of resevoirs to meet daily peak demand, and (7) provision of technical assistance to the Public Water Corporation (PWC), including detection and control of water losses, systems analysis and operation, construction supervision, and selection and development of a computerized accounting system. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Yemen |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Residential, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Yemen, Republic of
- ADEN PORT REHABILITATION
- RY-RURAL WATER SUPPLY ADD. FINANCING
- Yemen Integrated Urban Services Emergency Project
- Additional Financing for Third Social Fund for Development Project
- TIHAMA DEVT SUPPLEMENT
- Yemen: Pilot Program for Climate Resilience Phase I (PPCR I)
- RY-TAIZ WATER SUPPLY PILOT
- Yemen Emergency Human Capital Project
