logo

RY-SANA'A EMERGENCY POWER

Sector: Power Generation (CCGT) • Location: Yemen, Republic of

Source: World Bank Group

Project
Closed

The Sana'a Emergency Power Project development objectives are to: a) relieve critical supply constraints and meet the growing demand for'a reliable and adequate power supply, particularly in Sana'a, the key load center, until'a master plan can be designed and implemented for further least-cost system expansion; and b) lay the foundation for development and reform of the power sector in an economic

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Yemen
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about RY-SANA'A EMERGENCY POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “RY-SANA'A EMERGENCY POWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Yemen, Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Sana'a Emergency Power Project development objectives are to: a) relieve critical supply constraints and meet the growing demand for'a reliable and adequate power supply, particularly in Sana'a, the key load center, until'a master plan can be designed and implemented for further least-cost system expansion; and b) lay the foundation for development and reform of the power sector in an economically and environmentally sustainable manner, and with increased participation of the private sector. The project consists of four components: a) new generation capacity; b) rehabilitation of existing generation units and transmission networks; c) project management and training; and d) technical assistance for sector planning and institutional reform.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Yemen

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project