RY-TAIZ FLOOD DISASTER
Sector: Road • Location: Yemen, Republic of
Source: World Bank Group
This project will provide protection of public and private properties against economic losses due to flooding, and will reduce the risk of loss of human life. The primary objective is to provide the city of Taiz with essential flood control works. Other objectives include : a) implementing a project cost recovery mechanism at a municipal level; b) promoting implementation of a national municipal
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Yemen
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RY-TAIZ FLOOD DISASTER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will provide protection of public and private properties against economic losses due to flooding, and will reduce the risk of loss of human life. The primary objective is to provide the city of Taiz with essential flood control works. Other objectives include : a) implementing a project cost recovery mechanism at a municipal level; b) promoting implementation of a national municipal resource mobilization policy; and c) further strengthening the institutional capabilities of MRH and its main branch offices. Project components are the following : 1) flood control structures consisting of open channels and box culverts, sediment and boulder traps, at various places in Wadis Seena, Al Nassar, Madam, and Al Kamet; 2) restoration of street pavement; 3) conservation of soils through terracing of unstable slopes; 4) surface drainage footpaths in narrow and steep streets to control erosion; 5) land acquisition; 6) the purchase of equipment for road maintenance and flood control structures; 7) institutional strengthening of MRH and its main branch offices through technical assistance; 8) introduction of a national municipal resource mobilization policy and implementation of project cost recovery; 9) hiring of consultants; and 10) training MRH staff. |
Original sector | FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management,Transportation |
Budget |
Location
Country | Yemen |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
