Rye Park Wind Farm
One of 5,618 projects Taiyo tracks in New South Wales.
Source: AFR
The Rye Park wind farm near Yass, NSW, consists of 66 turbines and has been operational for at least 18 months. The project has led to a higher than expected number of wedge-tailed eagle deaths, with 20 eagles killed in the past 18 months. The owner, Tilt Renewables, is looking at new mitigation measures including a wedge-tailed eagle mitigation plan to protect native fauna and reduce bird deaths.
- Status
- Under Construction
- Sector
- Raw Materials, Wind
- Location
- Yass, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- AFR
ConstructChat
Ask ConstructChat about Rye Park Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rye Park wind farm near Yass, NSW, consists of 66 turbines and has been operational for at least 18 months. The project has led to a higher than expected number of wedge-tailed eagle deaths, with 20 eagles killed in the past 18 months. The owner, Tilt Renewables, is looking at new mitigation measures including a wedge-tailed eagle mitigation plan to protect native fauna and reduce bird deaths. The project offsets more than 755,000 tonnes of carbon emissions annually. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
City | Yass |
Source
Source | AFR |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Wind |
Article published date | 2026-07-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
