Rye Road Reclaimed Pump Station Upgrade
Sector: Power Generation (CCGT) • Location: Bradenton, Florida, United States of America
Source: Dodge USA
Remove three existing pumps and furnish and install three 150 hp and one 75 hp horizontal splitcase pumps and required electrical upgrades. Inspect discharge piping, pipe bracing, base ells, influent main brackets, and mounting plates for corrosion damage and replace as necessary.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Remove three existing pumps and furnish and install three 150 hp and one 75 hp horizontal splitcase pumps and required electrical upgrades. Inspect discharge piping, pipe bracing, base ells, influent main brackets, and mounting plates for corrosion damage and replace as necessary. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
