S 149th St & S 150th St Water Main Replacement
Sector: Water Supply and Storage • Location: Seattle, Washington, United States of America
Source: Dodge USA
Project Overview : The existing 6 caste iron water main along S 149th St and along S 150th St is undersized and has reached its useful life. The looped water main along 150th will be replaced from Macadam Rd to the Cul-de-sac. The semi-looped line along 149th will be converted to a fully looped line and will be replaced from Macadam Rd to 57th Ave S. The improvements will see the installation of m
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment, Steel
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about S 149th St & S 150th St Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Overview : The existing 6 caste iron water main along S 149th St and along S 150th St is undersized and has reached its useful life. The looped water main along 150th will be replaced from Macadam Rd to the Cul-de-sac. The semi-looped line along 149th will be converted to a fully looped line and will be replaced from Macadam Rd to 57th Ave S. The improvements will see the installation of more than 1,200 feet of 12 ductile iron water main, improving water quality and fire flow availabi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment, Steel |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
