S. Baxter Street 15 Th Street to 7 Th Street Reconstruction
One of 10,000+ projects Taiyo tracks in Indiana.
Source: Dodge USA
Project consists of total reconstruction of approximately 1,850 linear feet of street pavement at varying widths from 27 to 29 feet, for a total of 5,850 square yards, with pavement section to be 6 inches of asphalt on 12 inches of limestone base, including placement of approximately 3,750 linear feet of 4-inch perforated flex underdrain pipe. Also including removal and replacement of the followin
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Auburn, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about S. Baxter Street 15 Th Street to 7 Th Street Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of total reconstruction of approximately 1,850 linear feet of street pavement at varying widths from 27 to 29 feet, for a total of 5,850 square yards, with pavement section to be 6 inches of asphalt on 12 inches of limestone base, including placement of approximately 3,750 linear feet of 4-inch perforated flex underdrain pipe. Also including removal and replacement of the following: 3,785 linear feet of concrete curb and gutter, approximately 1,760 square yards of concrete si... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Auburn |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
