S. El Camino Real Lane Reconfiguration & Buffered Bike Lane
Bid results · California · Last reported Apr 2025
Source: Dodge
Project includes pavement cold milling and overlay, slurry seal, concrete repair including curb and gutter, curb ramp, sidewalk, driveway approach, utility work to replace the existing pull boxes with new ones while maintaining the same grade, striping and signing, and other tasks as described in the specifications.
- Status
- Closed
- Sector
- Government, Cement, Consumer Products, Power Generation (CCGT), Manufacturing (Industrial), Car parking, Road, Power Transmission, Automotive, Commercial
- Location
- San Clemente, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about S. El Camino Real Lane Reconfiguration & Buffered Bike Lane
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes pavement cold milling and overlay, slurry seal, concrete repair including curb and gutter, curb ramp, sidewalk, driveway approach, utility work to replace the existing pull boxes with new ones while maintaining the same grade, striping and signing, and other tasks as described in the specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Clemente |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Consumer Products, Power Generation (CCGT), Manufacturing (Industrial), Car parking, Road, Power Transmission, Automotive, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
