logo
ProjectApproved

S17 EXPRESSWAY PIASKI - HREBENNE

The status, timeline and source of this project. A free account opens every field.

Source: European Investment Bank (EIB)

The project will finance the construction of four non-continuous 93.2 km long S17 expressway sections between Piaski and Hrebenne. In detail, its includes the establishment of a "greenfield", primarily 2x2 lane expressway, mostly along a new alignment, 14 grade-separated interchanges, advanced drainage systems, noise protection screens, as well as approximately 98 engineering structures, including

Status
Prospective
Sector
Road, Government, Waste Processing and Treatment
Location
Poland
Updated
19 Nov 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about S17 EXPRESSWAY PIASKI - HREBENNE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “S17 EXPRESSWAY PIASKI - HREBENNE” is an infrastructure initiative in the Road sector, located in Poland. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project will finance the construction of four non-continuous 93.2 km long S17 expressway sections between Piaski and Hrebenne. In detail, its includes the establishment of a "greenfield", primarily 2x2 lane expressway, mostly along a new alignment, 14 grade-separated interchanges, advanced drainage systems, noise protection screens, as well as approximately 98 engineering structures, including bridges, viaducts, flyovers, and animal crossings. It also encompasses connections to local and service roads, six expressway service areas, and two expressway maintenance centres.

Original sector

Transport

Location

Country

Poland

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Road, Government, Waste Processing and Treatment

Article published date

2025-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project