S17 EXPRESSWAY PIASKI - HREBENNE
One of 10,000+ projects Taiyo tracks in Poland.
Source: European Investment Bank (EIB)
The project will finance the construction of four non-continuous 93.2 km long S17 expressway sections between Piaski and Hrebenne. In detail, its includes the establishment of a "greenfield", primarily 2x2 lane expressway, mostly along a new alignment, 14 grade-separated interchanges, advanced drainage systems, noise protection screens, as well as approximately 98 engineering structures, including
- Status
- Under Construction
- Sector
- Road, Waste Processing and Treatment, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about S17 EXPRESSWAY PIASKI - HREBENNE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will finance the construction of four non-continuous 93.2 km long S17 expressway sections between Piaski and Hrebenne. In detail, its includes the establishment of a "greenfield", primarily 2x2 lane expressway, mostly along a new alignment, 14 grade-separated interchanges, advanced drainage systems, noise protection screens, as well as approximately 98 engineering structures, including bridges, viaducts, flyovers, and animal crossings. It also encompasses connections to local and service roads, six expressway service areas, and two expressway maintenance centres. |
Original sector | Transport |
Location
Country | Poland |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Government |
Article published date | 2026-01-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
