S2185 Lake Forest Sidewalk Phase I BDE
Sector: Raw Materials • Location: Sandy Springs, Georgia, United States of America
Source: Dodge USA
This project includes a sidewalk construction on the west side of Lake Forrest Drive (S2185 Phase 1). The project will install 6 sidewalk with 2 landscape strip from 4838 Lake Forrest Drive to 4852 Lake Forrest Drive and from 5022 Lake Forrest Drive to 14 Mt. Paran Drive. The project is to be funded through the Sandy Springs TSPLOST funding.
- Status
- Closed
- Sector
- Raw Materials, Car parking, Government, Automotive, Commercial
- Location
- Sandy Springs, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about S2185 Lake Forest Sidewalk Phase I BDE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes a sidewalk construction on the west side of Lake Forrest Drive (S2185 Phase 1). The project will install 6 sidewalk with 2 landscape strip from 4838 Lake Forrest Drive to 4852 Lake Forrest Drive and from 5022 Lake Forrest Drive to 14 Mt. Paran Drive. The project is to be funded through the Sandy Springs TSPLOST funding. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Sandy Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Car parking, Government, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
