logo

S26 Narissong to Changtan (Longkou) Expressway

Sector: Road • Location: China

Source: World Bank Group

Project
Active

The project comprises the construction of the S26 Narissong to Changtan (Longkou) Expressway in Inner Mongolia Autonomous Region, China. Construction started on September 27, 2023. This project is an important component of the S26 Zhungeer Yinchuan Expressway in the autonomous region's highway network, invested by Inner Mongolia Transportation Group Zhungeer Banner High Grade Highway Investment Co

Project Information FAQ

Project Information

4 Q
The project “S26 Narissong to Changtan (Longkou) Expressway” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction of the S26 Narissong to Changtan (Longkou) Expressway in Inner Mongolia Autonomous Region, China. Construction started on September 27, 2023. This project is an important component of the S26 Zhungeer Yinchuan Expressway in the autonomous region's highway network, invested by Inner Mongolia Transportation Group Zhungeer Banner High Grade Highway Investment Co., Ltd. The total investment of this project is about $957.4m (7 billion yuan). The project general construction was successfully awarded on Feb 27, 2023 to a consortium composed of China Communications First Public Works Group Co., Ltd., China Metallurgical Road and Bridge Construction Co., Ltd., Inner Mongolia Road and Bridge Group Co., Ltd., Inner Mongolia Jiaoke Road and Bridge Construction Co., Ltd., and Zhongzi Huake Transportation Construction Technology Co., Ltd. The total length of the main line is 54.685km, two-way four lane highway, with a design speed of 80km/h. The entire line is equipped with 1 super large bridge, 28 large and medium bridges, 153 culverts, 3 separate interchanges, 3 interchanges, 1 service area, and 1 maintenance work area. It is expected to be completed and opened to traffic in 2027. https://www.seetaoe.com/details/225391.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data