S3 EXPRESSWAY
Signed · Poland
Source: European Investment Bank (EIB)
The project consists of two components, as follows: (i) construction, largely on a new alignment, of 82 km of 2 x 2 expressway between Nowa Sol and Legnica (2 x 3 between Polkowice and Lubin where the existing 2 x 2 will be widened); (ii) construction of three other separate works, namely the conversion to 2 x 2 expressway standard of the approx. existing 12 km Gorzow and 6 km Miedzyrzecz bypasses
- Status
- Under Construction
- Sector
- Road, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about S3 EXPRESSWAY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of two components, as follows: (i) construction, largely on a new alignment, of 82 km of 2 x 2 expressway between Nowa Sol and Legnica (2 x 3 between Polkowice and Lubin where the existing 2 x 2 will be widened); (ii) construction of three other separate works, namely the conversion to 2 x 2 expressway standard of the approx. existing 12 km Gorzow and 6 km Miedzyrzecz bypasses as well as the 44 km section between Sulechow and Nowa Sol. Both components are in western Poland. These sections form part of the 470 km S3 expressway corridor from the Czech border in southern Poland to Swinoujscie on the Baltic coast, a north-south route which is under incremental development and is expected to be completed in the next programming period (2014-2020). The S3 is part of the TEN-T core network corridor “Baltic-Adriatic". |
Original sector | Transport |
Location
Country | Poland |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
