S8 EXPRESSWAY KOBIERZYCE - BARDO
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project concerns the construction of a 63.9 km section of the S8 expressway between Kobierzyce and Bardo on the Trans-European Transport Network (TEN-T) Comprehensive Network, close to the border with Czechia. It will complete a key missing link in the north-south corridor, improving regional connectivity between the Wrocław metropolitan area and southern Lower Silesia, while strengthening Eur
- Status
- Prospective
- Sector
- Road
- Location
- Poland
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about S8 EXPRESSWAY KOBIERZYCE - BARDO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project concerns the construction of a 63.9 km section of the S8 expressway between Kobierzyce and Bardo on the Trans-European Transport Network (TEN-T) Comprehensive Network, close to the border with Czechia. It will complete a key missing link in the north-south corridor, improving regional connectivity between the Wrocław metropolitan area and southern Lower Silesia, while strengthening European connectivity between Central Europe and the Baltic States. |
Original sector | Transport |
Location
Country | Poland |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
