SAB Office Building / Sergei Tchoban
One of 10,000+ projects Taiyo tracks in Germany.
Source: ArchDaily
Advantage has been taken of the upwardly sloping site to cut the ground floor of the building into the terrain by half a storey. In the direction of the courtyard this produces an open space which is partly overhung by the storeys above. Into this space the exposed vaulted rear side of the underground beer cellar has been integrated like a historical ruin. Two ground-floor conference rooms are ori
- Status
- Closed
- Sector
- Road, Cement, Manufacturing (Industrial), Automotive, Car parking, Warehouse, Residential, Commercial
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about SAB Office Building / Sergei Tchoban
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Advantage has been taken of the upwardly sloping site to cut the ground floor of the building into the terrain by half a storey. In the direction of the courtyard this produces an open space which is partly overhung by the storeys above. Into this space the exposed vaulted rear side of the underground beer cellar has been integrated like a historical ruin. Two ground-floor conference rooms are orientated towards this special outdoor area. A further, significantly smaller, courtyard, recessed on all sides, is sunk into the plinth adjacent to the neighbouring building on Saarbruecker Strasse. This provides light for a further meeting room located in the plinth.Text description provided by the architects.The SAB office building is embedded in the site of the historical Koenigstadt Brewery in theBerlindistrict of Prenzlauer Berg, directly on Saarbruecker Strasse, a street which takes its character from its Art Nouveau and Wilhelminian style architecture. The plot is located on the prominent edge of the Barnim Plateau and, in the innermost part of the street block, rises approximately two metres from Saarbruecker Strasse. The new building occupies the free corner of the street and a private road leading into an extensive Gewerbehof (typical Berlin courtyard occupied by small industrial enterprises).The building offers flexible space for 400 workstations in single or multi-tenant use. The ground floor contains a conference centre with a central foyer and a Japanese garden. The roof of the building is covered in greenery. The technical structures on the roof are recessed into its surface so that they cannot be seen from the upper floors of neighbouring buildings. The two basement levels contain spaces for parking bicycles and cars, sanitary facilities for cyclists, e- charging stations, and various technical and storage rooms.Beer has not been brewed on the site of what was once Berlin's largest brewery for around 100 years. After an eventful history, the buildings are now in mixed use by neighbourhood initiatives, media companies, restaurants, and start-ups. The listed Gewerbehof of the Koenigstadt AG brewery dates to the 'Wagner's Bairisch-Bier-Brauerei' brewery, which was founded in 1849. Today it consists of six historical buildings framing the new office building. The former warehouse, built in 1872, is directly adjacent to SAB. The old vaulted cellar, which was used as a beer storage room, has been partly exposed, preserved, and sensitively integrated into the new building.The façades of the first to fifth storeys above the plinth consist of sawtooth-like, scaly, floor-to-ceiling windows in dark aluminium frames. The twisting of the upper storeys with differently orientated façade scaling and alternating large, two-storey bay windows makes the rotation of the upper part of the building even more eye-catching. The rotation and set back of the building volumes impart a certain lightness and pay respect to the surrounding buildings in this location by creating new visual axes. Depending on where the viewer is standing, the historical façades on the opposite side of the street are reflected in the windows a calculated optical interplay that, in a visual liaison between old and new, allows the new building to appear as a harmonious component in a historical street front that has developed over time.Concept. The reinforced-concrete skeleton structure with five upper floors and two basement floors rests on a solid base faced in clinker brick using a wild bond pattern which picks up on and at the same time reinterprets the materiality and colours of the surrounding industrial buildings. The plinth follows the building boundary on the street side. The storeys above it are set back with an approximately 15 degree rotation, allowing a view of the listed brewery buildings at the rear of the site. The roof of the plinth overlooking Saarbruecker Strasse fringes the upper storeys and has been designed as a spacious, partly planted terrace area. |
Location
Country | Germany |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Manufacturing (Industrial), Automotive, Car parking, Warehouse, Residential, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
