logo

Saba Power Company Ltd.

Sector: Oil and Gas • Location: Pakistan

Source: World Bank Group

Project
Active

This $154.0 million, 125-MW, oil-fired power plant at Farouqabad, Punjab is being developed by the Saba Power Company Ltd, a consortium of Coastal Saba Power Ltd. (90%) a Coastal Corporation subsidiary, Cogen Technologies (5%), Capco Resources (5%). Local energy company, Saba Petroleum had been one of the earlier developers, but its 60% stake was bought out by Coastal Power, who later purchased an

Status
Prospective
Sector
Oil and Gas, Power Generation (CCGT), Water Supply and Storage, Government, Manufacturing (Industrial), Commercial
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Saba Power Company Ltd.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Saba Power Company Ltd.” is an infrastructure initiative in the Oil and Gas sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This $154.0 million, 125-MW, oil-fired power plant at Farouqabad, Punjab is being developed by the Saba Power Company Ltd, a consortium of Coastal Saba Power Ltd. (90%) a Coastal Corporation subsidiary, Cogen Technologies (5%), Capco Resources (5%). Local energy company, Saba Petroleum had been one of the earlier developers, but its 60% stake was bought out by Coastal Power, who later purchased an additional 30% from the remaining sponsors. Saba Coastal Ltd. will be the project operator. Powerflow International of Pakistan and Babcock and Wilcox are providing engineering and construction services for the project. Toshiba is an equipment supplier. The facility was expected to become operational during 1999. Financial closure was reached in March 1996. Financing was obtained from the USEXIM Bank and a $23.5 million commercial facility set-up by Nissho Iwai Corp. A $5.0 million political risk guarantee was provided by MIGA. The project has a 30-year power purchase agreement with the Water and Power Development Authority of Pakistan (WAPDA). In its fiscal year 1997, MIGA guarantees totaling $5 million covered a portion of Cogen Technologies' $22 million equity investment in Saba Power against the risks of expropriation, transfer restriction, and war and civil disturbance. Pakistan State Oil Compant Limited was the fuel supplier, under a 30 year contract. In 2001, El Paso Corporation merged with Coastal Power and thereby acquired a 94% stake in Saba Power Company Ltd. On June 13, 2008, Saba Power Company Ltd. acheived closure on the refinancing of its outstanding project debt. The project company secured a US$36.7 million term loan tranche, extended by Bank of Tokyo-Mitsubishi UFJ (US$18.35 million) and Sojitz Corporation (US$18.35 million), and a US$36.7 million export credit tranche, provided by the USEXIM Bank, Royal Bank of Scotland, Banco Popolare di Milano, DZ Bank, ABN Amro and SMBC. http://www.sabapower.com

Original sector

Energy

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT), Water Supply and Storage, Government, Manufacturing (Industrial), Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project