Sabac District Heating Upgrade

Sector: Natural Gas • Location: Serbia

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

The EBRD is considering providing a senior loan of up to €7 million to the City of Sabac (the “City”), located in western Serbia, to support the upgrade of the City’s district heating (“DH”) system.  The loan will be on-lent to Sabac District Heating Company (the “Company”), entirely owned by the City.

	The technical due diligence, currently ongoing, will determine the least cost and most energy

Project Information FAQ

Project Information

3 Q
The project “Sabac District Heating Upgrade” is an infrastructure initiative in the Natural Gas sector, located in Serbia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering providing a senior loan of up to €7 million to the City of Sabac (the “City”), located in western Serbia, to support the upgrade of the City’s district heating (“DH”) system.  The loan will be on-lent to Sabac District Heating Company (the “Company”), entirely owned by the City. The technical due diligence, currently ongoing, will determine the least cost and most energy efficient technical solution to upgrade the DH system. The upgrade will focus on the introduction of local biomass, as partial replacement for natural gas, for heat generation. The due diligence will consider the installation of new biomass-fired boilers or a small-scale combined heat and power plant (“CHP”) for simultaneous generation of heat and electricity. The Project will be implemented by a Project Implementation Unit supported by external experienced consultants financed from technical assistance funds. The success of the Project will be measured by the following benchmarks: The transition impact potential of the Project arises from: Sabac District Heating Company. It is wholly owned by the City of Sabac and it is responsible for operating the DH system in Sabac. The Company owns two district heating plants (installed capacity of 66.6 MW) and two small capacity boilers (installed capacity of 6.8 MW). It provides heating services to 7,514 households and, in 2012, it produced and sold 70,175 MWh of heating energy. Up to €7 million loan to the City of Sabac to be on-lent to the Company, co-financed with a capital grant of up to €2 million from an international bilateral or multilateral donor. Total project costs to be determined during due diligence. The project has been Categorised B in line with the Bank’s 2008 Environmental and Social Policy. The independent environmental and social due diligence (“ESDD”) of the Company and the project consisted of an E&S audit of the Company's management systems and practices, the existing facilities and operations, and an E&S analysis of the impacts and benefits of the Project. The ESDD identified that the implementation of the Project will result in increased reliability and efficiency of district heating services, and reduction of air emissions as well as heat, energy and hot water losses. The Project may cause some temporary environmental, occupational health impacts during the construction phase, which can be mitigated by adoption of good construction practice. An Environmental and Social Action Plan (“ESAP”) has been developed and should be agreed with the Company to address some areas for improvement identified during the ESDD and carry out the necessary mitigation measures which will enable the Company to comply with national regulations and the Bank’s Performance Requirements. In addition, the ESAP also requires the development and implementation of a Stakeholder Engagement Plan and grievance mechanism. The Company will also disclose locally information on its environmental and social performance. The project will be monitored in terms of its environmental and social performance and implementation of the ESAP through annual E&S reports and site visits when deemed necessary. EBRD will mobilise funds from donors to support the following technical cooperation: Pre-signing:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data