Sabine-Neches Waterway Channel Improvement
Closed · Texas · Last reported Sep 2024
Source: Dodge USA
The work consists of Schedule No. 1 and nine Options. The scope of this contract is for dredging work which involves removal of shoaled material of the existing channel and the deepening construction to the prescribed authorized transition depths required of new channels. Since this deepening construction is in a portion of the channel that did not require dredging previously, this is considered n
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Commercial
- Location
- Beaumont, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sabine-Neches Waterway Channel Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of Schedule No. 1 and nine Options. The scope of this contract is for dredging work which involves removal of shoaled material of the existing channel and the deepening construction to the prescribed authorized transition depths required of new channels. Since this deepening construction is in a portion of the channel that did not require dredging previously, this is considered new work. All material from the finished construction project templates will be dredged and placed... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Beaumont |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
