logo

Sadawi Solar Project

Sector: Power Generation (CCGT) • Location: Saudi Arabia

Source: PV Tech

Project
Awarded

Shanghai Electric and Masdar have signed an agreement to build a 2GW solar project in Saudi Arabia, which will be Shanghai Electric’s largest engineering, procurement and construction (EPC) contract globally, covering 40 square kilometers.

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
Saudi Arabia
Updated
22 Jul 2026
Source
PV Tech

ConstructChat

Ask ConstructChat about Sadawi Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sadawi Solar Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Saudi Arabia. Taiyo aggregates data on it from PV Tech.

Participants

Company

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Shanghai Electric and Masdar have signed an agreement to build a 2GW solar project in Saudi Arabia, which will be Shanghai Electric’s largest engineering, procurement and construction (EPC) contract globally, covering 40 square kilometers.

Original sector

Renewable Energy

Location

Country

Saudi Arabia

Source

Source

PV Tech

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-04-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project