Sade Initiative
Sector: Energy Storage • Location: Yukon, Canada
Source: Infrastructure Canada
The project consists of the construction of a solar power plant combined with a battery energy storage system that will be connected to the grid in Watson Lake, Yukon. The scope of the Sade Initiative project is the feasibility, design, and construction of a photovoltaic (PV) power plant combined with a battery energy storage system that will be connected to the Watson Lake grid. When running at f
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of the construction of a solar power plant combined with a battery energy storage system that will be connected to the grid in Watson Lake, Yukon. The scope of the Sade Initiative project is the feasibility, design, and construction of a photovoltaic (PV) power plant combined with a battery energy storage system that will be connected to the Watson Lake grid. When running at full capacity (March to October), the plant will provide more energy than the peak loads, allowing for full generator off time. The PV plant will interconnect with the existing diesel microgrid, and power fluctuations and backup will be mitigated. Additional earthworks are specified as part of this project to prepare the site for the solar array and the access road will be upgraded to support the high volume of transport trucks. The power produced from this project will directly offset diesel consumption and contribute to reducing GHG emissions. The project is expected to offset 1,077,880 L of diesel equivalent to an offset of 2,977t GHG per year. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
