Sade Initiative
In progress · Yukon
Source: Infrastructure Canada
The project consists of the construction of a solar power plant combined with a battery energy storage system that will be connected to the grid in Watson Lake, Yukon. The scope of the Sade Initiative project is the feasibility, design, and construction of a photovoltaic (PV) power plant combined with a battery energy storage system that will be connected to the Watson Lake grid. When running at f
- Status
- Under Construction
- Sector
- Solar, Road, Energy Storage, Power Generation (CCGT), Government
- Location
- Yukon, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Sade Initiative
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the construction of a solar power plant combined with a battery energy storage system that will be connected to the grid in Watson Lake, Yukon. The scope of the Sade Initiative project is the feasibility, design, and construction of a photovoltaic (PV) power plant combined with a battery energy storage system that will be connected to the Watson Lake grid. When running at full capacity (March to October), the plant will provide more energy than the peak loads, allowing for full generator off time. The PV plant will interconnect with the existing diesel microgrid, and power fluctuations and backup will be mitigated. Additional earthworks are specified as part of this project to prepare the site for the solar array and the access road will be upgraded to support the high volume of transport trucks. The power produced from this project will directly offset diesel consumption and contribute to reducing GHG emissions. The project is expected to offset 1,077,880 L of diesel equivalent to an offset of 2,977t GHG per year. |
Original sector | Green Energy |
Location
Country | Canada |
State | Yukon |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Solar, Road, Energy Storage, Power Generation (CCGT), Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Canada
- Calgary Board of Education K-4 School Bundle
- Acden Corporate Headquarters and Fleet Facility
- Bluenose Academy
- Brandon - Transit Shelters Lighting Project
- Grand Renewable Energy Park Haldimand County Ontario
- Sheridan College Hazel McCallion Campus (Phase 2)
- Solar System for Community Cultural Complex and Roundhouse
- Sol Aurora Solar Project
