Sadler Road Improvements
Sector: Water Supply and Storage • Location: Richmond, Virginia, United States of America
Source: Dodge USA
The proposed improvements total approximately 9,600 linear feet, generally from Dominion Boulevard to just east of Cedar Branch Court. Improvements will consist of a two-lane curb and gutter roadway with a shared center left turn lane, with a portion of the project on new location with signing, pavement markings, proposed water and sewer (public utilities) and landscaping. The project also include
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Richmond, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sadler Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed improvements total approximately 9,600 linear feet, generally from Dominion Boulevard to just east of Cedar Branch Court. Improvements will consist of a two-lane curb and gutter roadway with a shared center left turn lane, with a portion of the project on new location with signing, pavement markings, proposed water and sewer (public utilities) and landscaping. The project also includes the construction of two roundabouts, one at the intersection with Old Sadler / Innslake Drive w... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Richmond |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
