Translated version of this PSD: Ukrainian The project will finance the establishment of a coal recycling business to produce energy coal from waste dumps and tailing ponds in Eastern Ukraine. It will develop a recycling technology with clear efficiency and environmental remediation benefits new to Ukraine. The project will support the private sector in the State-dominated coal industry in Ukraine.

Project Information FAQ

Project Information

4 Q
The project “Sadovaya Coal Recycling” is an infrastructure initiative in the Water Supply and Storage sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

signed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Ukrainian The project will finance the establishment of a coal recycling business to produce energy coal from waste dumps and tailing ponds in Eastern Ukraine. It will develop a recycling technology with clear efficiency and environmental remediation benefits new to Ukraine. The project will support the private sector in the State-dominated coal industry in Ukraine. Positive transition impact is expected to arise from the demonstration effect of the efficiency improvements arising from the introduction of modern technology for the recycling of waste coal, and improving transparency and environmental and health & safety standards in the Ukrainian coal sector. Interdon, a 100% indirectly owned subsidiary of Sadovaya Group SA , a Luxembourg-based holding company of a Ukrainian coal mining and trading enterprise. Loan up to USD 36million. Up to USD 48million. Screening categories and rationale for classification Categorised B in accordance with the EBRD’s E&S Policy 2008: due diligence undertaken by the EBRD’s independent consultant has confirmed that E&S impacts at the Company's proposed project locations are site specific and any residual risks have been addressed by way of an agreed action plan. Information reviewed Due diligence comprised a site visit by the independent consultant, management discussions and document review during August 2011. Environmental and Social issues The project can currently be considered to be in the development phase and site locations are currently being selected for the citing of the processing plants. As such, E&S management systems have not yet been developed by the Company and regulatory approval for the projects will only be provided when design documents have been completed by the Company. The EBRD requires that this be addressed prior to construction / commissioning as appropriate. The proposed locations of processing plants are likely to be degraded environments at existing / former coal works. Notwithstanding this, there are potential project site locations which may be include residential areas within Sanitary Protection Zones (SPZs) at one or two of the sites. The project sites may therefore be deemed to be a contributing facility to SPZ issues and therefore assume responsibility for potential resettlement of residences. The EBRD requires that this be fully assessed during project design feasibility studies and to demonstrate that there is no net impact to the SPZ as a result of the project. In the event that resettlement is required then the Company is required to complete this in accordance with EBRD and other IFI Policies. Environmental & social opportunities Ultimately the project will deliver a net environmental benefit, utilising coal waste stockpiles into a recoverable energy source, reducing the risk of regional degradation of land and water quality and restoring land to its original form. Summary of Environmental and Social Action Plan (ESAP) An ESAP has been developed and is currently being agreed with the Company. ESAP items have been divided into three categories: corporate level; construction phase; and operational phase (including decommissioning) actions. The ESAP commits the client to delivering these action items in a timely manner at the appropriate phase of project development. ESAP items primarily relate to the development of corporate and site specific environmental, health & safety and social management plans and procedures that will address each of the subsequent issues identified during due diligence. Obtaining appropriate regulatory approval for construction and operation of each stage of the project cycle is a requirement of the ESAP. The ESAP also commits the Company to identify and engage with Company stakeholder regarding project impacts and opportunities. The independent consultant has prepared a stakeholder engagement plan to be implemented and executed by the Company. None. Alex Dubyna IR Manager Tel: +38 06442 52552 Email: dubyna@sadovaya.com.ua

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data