logo

SAEMS Barcaple 2 SHPP

Sector: Hydro • Location: Sri Lanka

Source: World Bank Group

Project
Active

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.5MW Barcaple 2 small hydropower plant, in Nawalapitiya City, Nuwera Eliya District, Central Province. The project used two Pelton Turbines vertical shaft, and was expected to generate 17.0GWh annually. The project company was Didul Ltd. The project fed of the

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SAEMS Barcaple 2 SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SAEMS Barcaple 2 SHPP” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.5MW Barcaple 2 small hydropower plant, in Nawalapitiya City, Nuwera Eliya District, Central Province. The project used two Pelton Turbines vertical shaft, and was expected to generate 17.0GWh annually. The project company was Didul Ltd. The project fed of the Galadoda Oya River. Output was to be supplied to the national grid (Ceylon Electricity Board). Expected project life was 28 years. Expected tariff was Rs 7.35/kWh. The PPA was signed in March 2008. The EPC contract signed in July 2008. Construction started in July 2008. The project commissioned in August 2012. Total cost was expected to be US$6.52 million. The investment decision was made in February 2007. Financial closure was reported at September 2008. The debt/equity ratio was expected to be 65/35. IRR was 14.05% without CDM and 16.85% with CDM (expected). The coordinates of the project are: Latitude 6° 58’37.44” N / Longitude 80° 32’31.70” E https://cdm.unfccc.int/filestorage/5/p/QZ8VI1HKCEW3OJP90L4RMFDAB5NUXS.pdf/PDD%20Ver%204.1%20-%2008%20Nov%2012.pdf?t=ZnJ8bWV4Zjk2fDBgx07wZPIpWPxTDtMvgQrM

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project